Progressive Design-Build | Carollo Design-Build Group
Clifton Water District needed a means to cost-effectively utilize their existing groundwater supplies and eliminate the need to purchase potable water from an outside supplier. They wanted an efficient water treatment plant with the flexibility to adapt to changes in source water quality that would serve them into the future.
Copyright © 2023 Water Collaborative Delivery Association