# Longmont WWTP Ammonia Treatment and Biosolids Dewatering Improvement

**Progressive Design-Build | Carollo Design-Build Goup  
**

 

Working closely with the plant operations staff, the Carollo Design-Build Group engineered and constructed a solution that allowed the replacement of existing aeration and clarifiers with minimal disruption to the operation of the facility.

![Longmont2 (2)](https://info.watercollaborativedelivery.org/hubfs/Project%20Spotlights/Project%20Spotlight%20Photos/Longmont2%20(2).jpg)

## Download this project spotlight to learn more:

- The impact of progressive design-build's flexibility
- Significant cost savings on hauling biosolids away
- How the wastewater plant stayed in operation during construction

Copyright © 2026 Water Collaborative Delivery Association

[Privacy Policy](https://watercollaborativedelivery.org/privacy-policy/)

<https://www.linkedin.com/company/2249750/>   <https://www.facebook.com/WaterCollaborativeDeliveryAssociation>   [mailto:info@WaterCollaborativeDelivery.org](mailto:info@WaterCollaborativeDelivery.org)   <https://watercollaborativedelivery.org>