Fixed-Price Design-Build | Kiewit & Brown and Caldwell
The RM Clayton Water Reclamation Control (WRC) facility needed to mitigate the harmful effects of grit accumulation throughout the plant. The City of Atlanta required a team that could offer immediate grit relief solutions as well as a new headworks facility to provide long-term reliability.
Copyright © 2023 Water Collaborative Delivery Association