# THORNTON WTP REPLACEMENT

**Progressive Design-Build  
****Garney Construction and   
****Burns & McDonnell  
**

 

With a rapid growth in population, the city of Thornton needed to replace its aging drinking water plant and make it resilient and robust enough to meet water demands 365 days a year, flexible enough to treat the multiple source waters, and have a robust taste and odor treatment system to mitigate algae-sourced challenges within Thornton's raw water storage reservoirs.

![Thornton 6307 - Flying 70,000lb precast girders over the intake gallery for the upper deck-enhanced Faith](https://info.watercollaborativedelivery.org/hubfs/Thornton%206307%20-%20Flying%2070%2c000lb%20precast%20girders%20over%20the%20intake%20gallery%20for%20the%20upper%20deck-enhanced%20Faith.jpg)

## **Download this project spotlight to learn more: **

- How inovations and flexibility in the design helped operations
- The drivers behind choosing PDB
- How this project affected the community and serves as an example to others

Copyright © 2026 Water Collaborative Delivery Association

[Privacy Policy](https://watercollaborativedelivery.org/privacy-policy/)

<https://www.linkedin.com/company/2249750/>   <https://www.facebook.com/WaterCollaborativeDeliveryAssociation>   [mailto:info@WaterCollaborativeDelivery.org](mailto:info@WaterCollaborativeDelivery.org)   <https://watercollaborativedelivery.org>