Fixed-Price Design-Build | Parsons
The old Withlacoochee River Water Pollution Control Plant experienced extensive flooding, causing damage to the facility, permit violations, and spills into the Withlacoochee River. In response to a Georgia Environmental Protection Division consent order resulting from the flooding, the City of Valdosta sought a design-builder to fast-track a new greenfield plant to meet stringent effluent limits and produce Class B biosolids.
How the fixed-price design-build approach best served the City of Valdosta
How Parsons achieved more than $1 million in cost savings
The benefits of working collaboratively with subcontractors Reynolds Construction and Aqua-Aerobic Systems, Inc.
Copyright © 2023 Water Collaborative Delivery Association